Case study · Costel
Overhaul and recovery of critical assets · Morón Petrochemical Complex
Client: PEQUIVEN Industry: Oil & Gas / Petrochemical Location: Field (Morón) and Costel Industrial Plant (Valencia, Carabobo State)
- Scope of Service: Preventive fleet maintenance (9 units) and full rehabilitation (Overhaul) of 3 power transformers (4.2 MVA and 6 MVA) with active-part intervention at the Costel workshops.
1. Executive Summary
Key Impact: Extended service life and recovered reliability of 3 critical power transformers through workshop engineering processes (untanking and oven drying), guaranteeing factory insulation parameters and avoiding the costly replacement of assets.
2. Technical Challenge (The Problem)
- Critical Diagnosis: During the initial on-site testing at the Morón Complex, 3 units (4.2 MVA and 6 MVA) were found to have severe deviations in insulation resistance and internal contamination, which prevented safe operation.
- Field Limitation: The complexity of the repairs required (moisture in the active part and seal degradation) made correction on site impossible, calling for the controlled environment of a specialized workshop.
3. Comprehensive Solution (Costel Workshop Engineering)
The 3 units were transported to the Costel plant in Valencia, where a major recovery protocol was carried out:
- Active-Part Intervention: Complete untanking to inspect cores and windings.
- Thermal Treatment: Washing and oven drying of the active part to completely remove moisture from the solid (cellulose) insulation.
- Rebuilding and Sealing: Full replacement of gaskets and replacement of high- and low-voltage bushings.
- Fluid Treatment: Filling with new dielectric oil under high-vacuum processes.
- Laboratory Test Protocol:
- Applied voltage and induced voltage.
- Measurement of load and no-load losses (efficiency validation).
- Insulation power factor.
- Winding resistance.
- Transformation turns ratio.
- Insulation resistance.
- Physical and chemical analysis of the dielectric oil.
- Polarization index.
- Dissolved gas analysis (DGA).
- Application of paint with a special coating for corrosive environments (in accordance with national and international standards).
4. Results and Value Metrics
- Asset Recovery: Transformers that were out of standard were returned to an "as new" condition, with formal acceptance by the client after successful functional testing.
- Technical Precision: The ability to perform induced and applied voltage tests in-plant guaranteed that the equipment would withstand the demands of the client's electrical system, with no risk of internal arcing.
- Capital Savings (CAPEX): The major rehabilitation cost a fraction of the price of new equipment, with significantly shorter lead times.
5. Technical Data
| Attribute | Technical Detail |
| Fleet maintained | 9 units (preventive maintenance) |
| Full overhaul | 3 power transformers |
| Ratings serviced | 4.2 MVA and 6 MVA |
| Workshop location | Costel Industrial Plant, Valencia, Carabobo State |